Sunday, August 17, 2014

The Other Arch And Electrics

Based on prior experience, today I tackled the other arch. What took 2h30m for the right side took only 1h15m for the left side. I was amazed! And it looks a lot better! Well, on the pictures both sides look nice, but "on the flesh" it is different.
Next step was to finish the electrics. Spent some time considering the best way to pass the cables from inside the arches to the boot. Final decision was to drill a hole, with the 12mm drillbit, on the rear panel, hidden by the arch. Put some rubber pipe to "line" the hole, avoiding chaffing the hires. Then get the wires through the hole.
All wires crimped and connected. Just needs testing, which I couldn't do since the battery was not fitted. Next session will be lights testing and to fit the buttons for the boot cover.

No comments:

Post a Comment