I bought a small vice, hoping to fit the rear c/v joint in it and push the wheel studs through tightening the wheel nut over washers, as pictured two weeks ago. After some time and lots of puffing, I quit. It really didn't seem to move more than a third of what has to get in. I'll have to ask Steve if there is any problems in enlarging slightly the wholes. Otherwise, will have to take the rear calipers and wheel studs to the classical repair auto-shop and pay them to do it for me on their professional tools.
Then I used the vice to hold the tube where the upper rear caliper fits to. Steve told me I should put a file on it so that the caliper fits without effort, to make it easier to attach and detach it to adjust the wheel camber. I used an emery tip on my driller. Probably it's not the proper emery for steel, since it was doing it's job but taking a long time. We had visitors for dinner and I had to leave the job unfinished.
Build diary for my first kit car: an Aries Locoblade (http://www.ariesmotorsport.com/) that I will be building in Portugal for the next months (or years).
Saturday, November 27, 2010
Saturday, November 20, 2010
Drilling Holes - The Peddle Box
Finally mustered the needed courage to start drilling holes on the car. Summing it up, took me a bit over 1h30 and a 3mm drill bit to make 4 holes. But let's get into details...
Started by taking out the upper part of the steering column, since it got in the way and I assembled it too early.
Looking at the drill bits and the bolts that came with the peddle box, it seemed 8mm drill would make a hole too big. Started by drilling with a 3mm. When it went through the peddle box and the steel floor, it snapped. Enlarged the hole with a 4,5mm bit and ended up using the 8mm bit. The following two holes were done with the 4,5mm to mark the spot and the 8mm to open it up.
To finish that up, I went for the clutch cable, laid it in place and measured to drill for the clutch peddle stop bolt. Had to drill laying on my back from under the car. Ends up I measured once and drilled immediately... The mantra goes something like "Measure twice, drill once". I had to enlarge the hole to one side so that the bolt would actually stop the peddle. Enlarging with just the drill bit is not easy. But in the end, it all worked out well and the washers cover the enlarged hole.
Just a note on the clutch cable. It fits on the peddle with a bolt that came with it. But the bolt is too long. It would either had to be inserted on the peddle before attaching the peddle box to the car or be shorter. I'll have to shorten it up around 2mm to make it go through.
Started by taking out the upper part of the steering column, since it got in the way and I assembled it too early.
Looking at the drill bits and the bolts that came with the peddle box, it seemed 8mm drill would make a hole too big. Started by drilling with a 3mm. When it went through the peddle box and the steel floor, it snapped. Enlarged the hole with a 4,5mm bit and ended up using the 8mm bit. The following two holes were done with the 4,5mm to mark the spot and the 8mm to open it up.
To finish that up, I went for the clutch cable, laid it in place and measured to drill for the clutch peddle stop bolt. Had to drill laying on my back from under the car. Ends up I measured once and drilled immediately... The mantra goes something like "Measure twice, drill once". I had to enlarge the hole to one side so that the bolt would actually stop the peddle. Enlarging with just the drill bit is not easy. But in the end, it all worked out well and the washers cover the enlarged hole.
Just a note on the clutch cable. It fits on the peddle with a bolt that came with it. But the bolt is too long. It would either had to be inserted on the peddle before attaching the peddle box to the car or be shorter. I'll have to shorten it up around 2mm to make it go through.
Saturday, November 13, 2010
The Rear Uprights Revisited
Last weekend I had to work so I didn't get any kit car time. It was the first weekend I failed to put some hours on the kit since I started building it. It made me very sad.
But it was not all stopped. I swapped several emails with Steve from Aries regarding the distances between p-clips for the brake and petrol pipes and also about the rear uprights. As usual, Steve is a top person, very helpful and very interested. If I go over 4 weeks without sending him an email, he mails me to ask if everything is going well. This is top customer service!
Summing up the emails, for the p-clips the IVA man doesn't require 100mm between p-clips. He wants the pipes to be secure. Steve recommends the 100mm but he reckons that in some places a bigger spacing (150mm) is acceptable while in others the pipes get more secure with a shorter distance. I should use discretion and reason while doing this and be sure the pipes don't rub any metal from the chassis.
Steve also questioned me about the need I had to enlarge the hole on the rear suspension pickup by 1mm. It shouldn't have been needed. Probably, if I had taken out the bush tube and rubbers and fitted them again with more lithium grease, it would have gone into place. Anyway, no big harm done.
He additionally told me I should use the extra bush pipe he sent me, instead of washers, to make space on the lower axle of the upright. The bush pipe would have to be cut in half. As I don't have a tool for that, I questioned about using washers (even if I had to buy more) and he said it would be OK. But no washers on the back of the upright, only on the front side. (see edit at the bottom)
He added that the upright should get into place on the top wishbone bush tube easily to allow for later camber adjustment. That would require some filling of the bush pipe and rubber. I had to hammer that into place...
So, when I got to the car today I started by taking out the rear uprights and the upper bush tubes. I'll work all that out on my bench and then reassemble it all on the car.
One of the upright axles was slightly damaged on my hammering spree two weeks ago. The thread is a bit thorn and now the nut will not screw in. I tried to amend that with a file and a little hacksaw. It's not good yet, but I may be able to fix my mistake.
My last task was to try to fit the wheel studs on the outer c/v joints. A blog reader (thank you daveyboy) told be Steve had said to put loads of washers on the stud and then use a wheel nut to pull the stud into place. I tried that but the outer joint would start to rotate and I couldn't manage it. I'll have to try again later with the outer joint hold up tight in some way...
I'm considering buying a vice for my stand, would help me a lot in a couple of jobs I'll have in the future...
EDIT - 2013-03-24 - It is very important that the washers are really all at the front. It ensures proper castor settings and it also prevents the rod rubbing the inside of the wheel. Additionally, it is easier to set as accurate as possible the toe and camber at this point. Since I didn't manage to properly measure the settings, I used the same as a similar car from another builder, that was professionally set. See 2013-03-24 post for more information.
But it was not all stopped. I swapped several emails with Steve from Aries regarding the distances between p-clips for the brake and petrol pipes and also about the rear uprights. As usual, Steve is a top person, very helpful and very interested. If I go over 4 weeks without sending him an email, he mails me to ask if everything is going well. This is top customer service!
Summing up the emails, for the p-clips the IVA man doesn't require 100mm between p-clips. He wants the pipes to be secure. Steve recommends the 100mm but he reckons that in some places a bigger spacing (150mm) is acceptable while in others the pipes get more secure with a shorter distance. I should use discretion and reason while doing this and be sure the pipes don't rub any metal from the chassis.
Steve also questioned me about the need I had to enlarge the hole on the rear suspension pickup by 1mm. It shouldn't have been needed. Probably, if I had taken out the bush tube and rubbers and fitted them again with more lithium grease, it would have gone into place. Anyway, no big harm done.
He additionally told me I should use the extra bush pipe he sent me, instead of washers, to make space on the lower axle of the upright. The bush pipe would have to be cut in half. As I don't have a tool for that, I questioned about using washers (even if I had to buy more) and he said it would be OK. But no washers on the back of the upright, only on the front side. (see edit at the bottom)
He added that the upright should get into place on the top wishbone bush tube easily to allow for later camber adjustment. That would require some filling of the bush pipe and rubber. I had to hammer that into place...
So, when I got to the car today I started by taking out the rear uprights and the upper bush tubes. I'll work all that out on my bench and then reassemble it all on the car.
One of the upright axles was slightly damaged on my hammering spree two weeks ago. The thread is a bit thorn and now the nut will not screw in. I tried to amend that with a file and a little hacksaw. It's not good yet, but I may be able to fix my mistake.
My last task was to try to fit the wheel studs on the outer c/v joints. A blog reader (thank you daveyboy) told be Steve had said to put loads of washers on the stud and then use a wheel nut to pull the stud into place. I tried that but the outer joint would start to rotate and I couldn't manage it. I'll have to try again later with the outer joint hold up tight in some way...
I'm considering buying a vice for my stand, would help me a lot in a couple of jobs I'll have in the future...
EDIT - 2013-03-24 - It is very important that the washers are really all at the front. It ensures proper castor settings and it also prevents the rod rubbing the inside of the wheel. Additionally, it is easier to set as accurate as possible the toe and camber at this point. Since I didn't manage to properly measure the settings, I used the same as a similar car from another builder, that was professionally set. See 2013-03-24 post for more information.
Monday, November 8, 2010
EB Cargo Bad Service and Partial Refund
As I had mentioned before, I contracted through Shiply a freight forwarder to bring me the crate with my kit car. I contracted collection and delivery door-to-door and stated I needed equipment to load and unload the 650Kg crate to/from the transport.
EB Cargo (http://www.ebcargo.co.uk/) from Tamworth bid a very low price and they later revised it to more than double. As I posted on the 2nd August, they failed to provide lifting equipment on collection and Steve from Aries had to save the day getting a forklift.
If any readers have noticed, on the 11th August I had to pick the kit from a warehouse instead of having it delivered on my doorstep, as agreed and paid for. The reason was that EB Cargo stated, after the kit was already in transit, that they were not providing proper lifting equipment on delivery. Additionally, if I wanted to have that equipment, I would have to pay additional 210£. So I talked with the Portuguese transportation company and arranged to collect myself from their warehouse.
After having the kit, I tried to negotiate with EB Cargo for a refund for contracted but not delivered services (the lifting equipment). After all. they bumped the price to more than double for the equipment... They refused to give me the 315£ refund I wanted and would not accept the compromise I proposed of returning 190£ that was the difference between their price and what DHL would charge me for the same level of service (no equipment on collection, delivery to a warehouse near Lisbon). That compromise was based on the fact that, if they had told me that the 505£ didn't include equipment, I would have declined and gone for DHL. EB Cargo's manager named Brian Keates was almost abusive declining any responsibility, saying I had no reason and stating they would not refund more than 60£, the amount pertaining to the transport between Montijo and Lisbon, that I didn't get.
I then filed a complain through Paypal but they closed it immediately since they don't mediate service complaints.
My last chance was to complain directly to VISA. I filed the complain there, had to write a detailed document with my reasoning, scanned documents, emails and pictures. It was a 10 page document. I requested the 315£ refund but stated I would be OK with the compromise amount of 190£ refund. VISA later sent me EB Cargo's reply where they said they had provided 95% of the contracted service and as such would only refund 60£. VISA asked if I had anything to add. I rewrote a summary of my first document and stated that the percentage of delivered service was less. I also stated again my compromise amount.
Today VISA ruled the verdict and I was refunded 190£ through a charge back. I'm very happy! Not as much because of the money but mostly because EB Cargo was not serious on this matter and wrongs have been made right with the ruling. I would love to have seen Brian Keates face when he found out he's shaddy business actions had come back to bit his wallet.
Just to show two other actions EB Cargo and Brian Keates did that were shaddy...
1) When I gave them the date to collect the crate, he asked for the final crate dimensions. It was a bit bigger than stated before and he bumped the price around 30£. Seems fair to me. But he didn't give the new dimensions to the transportation companies, thus he pocketed that amount. I found that out because on the release form from the Portuguese transportation company the crate dimensions were the old ones.
2) When Brian sent me the email saying EB Cargo would charge me additional 210£ for proper equipment to download the crate from the truck at my doorstep, he was saying that it was the transport company demanding. He sent the full email history exchanged between EB Cargo, RH and Rangel. But he manually edited the company's price conversion from € to £ in a way that would make him pocket 20£ more. It's fare for him to have his margin on top of all services he would resell me, but not hide that margin, specially when it was a service that supposedly was already included...
So, final note... Never do business with EB Cargo (http://www.ebcargo.co.uk/) from Tamworth. As a freight forwarder, they acted shaddy and were not professional. Great I paid with VISA, otherwise I would have no way to avoid their scam.
Positive note to RH and Rangel, the UK and Portuguese transport companies that belong to the System Alliance Europe group of transport companies. The people from Rangel were also great to allow me to occupy a cargo bay on their enormous warehouse, for a whole morning, where I could open the crate and move it to my rented van.
EB Cargo (http://www.ebcargo.co.uk/) from Tamworth bid a very low price and they later revised it to more than double. As I posted on the 2nd August, they failed to provide lifting equipment on collection and Steve from Aries had to save the day getting a forklift.
If any readers have noticed, on the 11th August I had to pick the kit from a warehouse instead of having it delivered on my doorstep, as agreed and paid for. The reason was that EB Cargo stated, after the kit was already in transit, that they were not providing proper lifting equipment on delivery. Additionally, if I wanted to have that equipment, I would have to pay additional 210£. So I talked with the Portuguese transportation company and arranged to collect myself from their warehouse.
After having the kit, I tried to negotiate with EB Cargo for a refund for contracted but not delivered services (the lifting equipment). After all. they bumped the price to more than double for the equipment... They refused to give me the 315£ refund I wanted and would not accept the compromise I proposed of returning 190£ that was the difference between their price and what DHL would charge me for the same level of service (no equipment on collection, delivery to a warehouse near Lisbon). That compromise was based on the fact that, if they had told me that the 505£ didn't include equipment, I would have declined and gone for DHL. EB Cargo's manager named Brian Keates was almost abusive declining any responsibility, saying I had no reason and stating they would not refund more than 60£, the amount pertaining to the transport between Montijo and Lisbon, that I didn't get.
I then filed a complain through Paypal but they closed it immediately since they don't mediate service complaints.
My last chance was to complain directly to VISA. I filed the complain there, had to write a detailed document with my reasoning, scanned documents, emails and pictures. It was a 10 page document. I requested the 315£ refund but stated I would be OK with the compromise amount of 190£ refund. VISA later sent me EB Cargo's reply where they said they had provided 95% of the contracted service and as such would only refund 60£. VISA asked if I had anything to add. I rewrote a summary of my first document and stated that the percentage of delivered service was less. I also stated again my compromise amount.
Today VISA ruled the verdict and I was refunded 190£ through a charge back. I'm very happy! Not as much because of the money but mostly because EB Cargo was not serious on this matter and wrongs have been made right with the ruling. I would love to have seen Brian Keates face when he found out he's shaddy business actions had come back to bit his wallet.
Just to show two other actions EB Cargo and Brian Keates did that were shaddy...
1) When I gave them the date to collect the crate, he asked for the final crate dimensions. It was a bit bigger than stated before and he bumped the price around 30£. Seems fair to me. But he didn't give the new dimensions to the transportation companies, thus he pocketed that amount. I found that out because on the release form from the Portuguese transportation company the crate dimensions were the old ones.
2) When Brian sent me the email saying EB Cargo would charge me additional 210£ for proper equipment to download the crate from the truck at my doorstep, he was saying that it was the transport company demanding. He sent the full email history exchanged between EB Cargo, RH and Rangel. But he manually edited the company's price conversion from € to £ in a way that would make him pocket 20£ more. It's fare for him to have his margin on top of all services he would resell me, but not hide that margin, specially when it was a service that supposedly was already included...
So, final note... Never do business with EB Cargo (http://www.ebcargo.co.uk/) from Tamworth. As a freight forwarder, they acted shaddy and were not professional. Great I paid with VISA, otherwise I would have no way to avoid their scam.
Positive note to RH and Rangel, the UK and Portuguese transport companies that belong to the System Alliance Europe group of transport companies. The people from Rangel were also great to allow me to occupy a cargo bay on their enormous warehouse, for a whole morning, where I could open the crate and move it to my rented van.
Saturday, October 30, 2010
Marking for Pipe P-Clips
Today I went around the car marking places where I have to drill to attach the p-clips with rivets. These p-clips will hold the brake oil and fuel pipes in place. I had the idea that I should have 100mm between p-clips. If so, I don't have enough to hold the fuel line.
Asked on the locostbuilders forum and created panic as it seems most people say 300mm between p-clips and only one mentioned 150mm. Some even say that the UK Individual Vehicle Approval legislation only states that it must be tightly into place.
So, no drilling was performed and I'll send an email to Steve asking him about distances as he surely knows the right answer.
Anyway, after marking the drilling spots and counting the p-clips, as I hadn't much time left, grabbed some of the aluminium body parts and laid them in place. That reminded me of several facts... I really shouldn't have assembled the steering column, it will have to go out. I have to buy tools to cut holes on the aluminium panels. All but one required holes: for the steering column, hand brake lever, gear lever, reverse box lever...
No pictures today; who would be interested in seeing pieces of masking tape on my chassis? ;)
Asked on the locostbuilders forum and created panic as it seems most people say 300mm between p-clips and only one mentioned 150mm. Some even say that the UK Individual Vehicle Approval legislation only states that it must be tightly into place.
So, no drilling was performed and I'll send an email to Steve asking him about distances as he surely knows the right answer.
Anyway, after marking the drilling spots and counting the p-clips, as I hadn't much time left, grabbed some of the aluminium body parts and laid them in place. That reminded me of several facts... I really shouldn't have assembled the steering column, it will have to go out. I have to buy tools to cut holes on the aluminium panels. All but one required holes: for the steering column, hand brake lever, gear lever, reverse box lever...
No pictures today; who would be interested in seeing pieces of masking tape on my chassis? ;)
Saturday, October 23, 2010
Rear Uprights On The Car
Started the work session with a grinding tip on my driller to enlarge the suspension support bracket hole. After some 30m of grinding, trying to fit, removing suspension arm and repeating, it got done.
Next step was to fit the hub carrier on the suspension arms. It seemed pretty hard to make it all fit but then I thought about putting some lithium grease and that helped. The upright was in place and I read again Steve's email to be sure of the following step. And although Steve wrote twice that I should be sure I was putting the hub carrier with the straight side and the caliper support holes to the front, I did it wrong. So, I had to remove the hub carrier from the suspension arm. This all was 30m more.
Fought with the correct hub carrier on that arm but wasn't able to get it in. So I went to the other side and did the other one in around half-hour, including fitting the outer c/v joint. I had to put some wood as support bellow otherwise the arms would go down on the hub weight and the outer c/v seemed to be in strain against the lower suspension arm.
I then went back to the driver's side (left side) and gave another go fitting the hub carrier on the suspension. It was harder than the right side but it eventually got hammered into place and that side got done too.
The 2€ rubber mallet I bought on the chinese shop is proving to be one of the most helpful tools on my tool-stand. I can hammer stuff around without damaging anything (aside from the mallet itself). I did damaged a bit the thread on one of the rods that hold the lower part of the hub in place. It will put on a fight now to screw the nut into place.
I still haven't screwed any nuts in. I'm still wondering if I should put "loctite" or not, since all the nuts have nylocs.
Next step was to fit the hub carrier on the suspension arms. It seemed pretty hard to make it all fit but then I thought about putting some lithium grease and that helped. The upright was in place and I read again Steve's email to be sure of the following step. And although Steve wrote twice that I should be sure I was putting the hub carrier with the straight side and the caliper support holes to the front, I did it wrong. So, I had to remove the hub carrier from the suspension arm. This all was 30m more.
Fought with the correct hub carrier on that arm but wasn't able to get it in. So I went to the other side and did the other one in around half-hour, including fitting the outer c/v joint. I had to put some wood as support bellow otherwise the arms would go down on the hub weight and the outer c/v seemed to be in strain against the lower suspension arm.
I then went back to the driver's side (left side) and gave another go fitting the hub carrier on the suspension. It was harder than the right side but it eventually got hammered into place and that side got done too.
The 2€ rubber mallet I bought on the chinese shop is proving to be one of the most helpful tools on my tool-stand. I can hammer stuff around without damaging anything (aside from the mallet itself). I did damaged a bit the thread on one of the rods that hold the lower part of the hub in place. It will put on a fight now to screw the nut into place.
I still haven't screwed any nuts in. I'm still wondering if I should put "loctite" or not, since all the nuts have nylocs.
Sunday, October 17, 2010
Rear Uprights, Flanges and Suspension Arms
Today I managed to get 3h30m around the car. My longest stretch since my vacations ended. I'm a very happy builder today!
I started by preparing the flanges to be fitted on the hub carriers. It was mostly a cleaning job. Before I tried to fit a flange on a hub carrier, I tried to fit the studs on the flange. Ends up the studs don't go fully in and there is a gap. I believe that is not right, so I used emery cloth on the inside of the holes. It still wasn't enough... I'll have to look into it later. At least I checked that I can put the studs in after the flange is attached to the hub carrier...
... So I went to that step. Followed carefully the instructions Steve from Aries wrote me on the long and detailed email he sent me in September, when I asked about the wheel bearings. It was a really easy job. Used a bit the hammer and a kind of screwdriver to hammer softly the upper wheel bearing helping the flange to sit into place.
With both flanges inserted, I did the cleaning and preparing of the outer C/V joints. It took a bit but was another easy job.
Since Steve's email stated that I should fit the rear uprights on the chassis prior to fitting the outer CV joints, I moved on to that task. The bag with bolts, washers and nuts contained 2 shorter bolts that were marked with masking tape but without any label. Fortunately, it was easy to understand that they should go on the lower suspension arm, where if I fit a bigger bolt it would clash with the rear bulkhead. The task was looking pretty easy. One side of the car is now done (apart from tightening the nuts). The other side is almost done. One of the bolts doesn't slide through one of the mounting points. I guess I'll have to grind the hole a bit wider but it was already too late to go get the tools for the job. It will have to wait for another day.
All in all, I'm really happy with the progress I did!
EDIT - 2011-01-30 - Where I say that the two smaller bolts go on the rear wishbones, it's incorrect. They are for the front upper shock bracket. And should mate with smaller nuts that were also on the bag.
I started by preparing the flanges to be fitted on the hub carriers. It was mostly a cleaning job. Before I tried to fit a flange on a hub carrier, I tried to fit the studs on the flange. Ends up the studs don't go fully in and there is a gap. I believe that is not right, so I used emery cloth on the inside of the holes. It still wasn't enough... I'll have to look into it later. At least I checked that I can put the studs in after the flange is attached to the hub carrier...
... So I went to that step. Followed carefully the instructions Steve from Aries wrote me on the long and detailed email he sent me in September, when I asked about the wheel bearings. It was a really easy job. Used a bit the hammer and a kind of screwdriver to hammer softly the upper wheel bearing helping the flange to sit into place.
With both flanges inserted, I did the cleaning and preparing of the outer C/V joints. It took a bit but was another easy job.
Since Steve's email stated that I should fit the rear uprights on the chassis prior to fitting the outer CV joints, I moved on to that task. The bag with bolts, washers and nuts contained 2 shorter bolts that were marked with masking tape but without any label. Fortunately, it was easy to understand that they should go on the lower suspension arm, where if I fit a bigger bolt it would clash with the rear bulkhead. The task was looking pretty easy. One side of the car is now done (apart from tightening the nuts). The other side is almost done. One of the bolts doesn't slide through one of the mounting points. I guess I'll have to grind the hole a bit wider but it was already too late to go get the tools for the job. It will have to wait for another day.
All in all, I'm really happy with the progress I did!
EDIT - 2011-01-30 - Where I say that the two smaller bolts go on the rear wishbones, it's incorrect. They are for the front upper shock bracket. And should mate with smaller nuts that were also on the bag.
Subscribe to: